The primary scope of BS EN ISO 22282-2 is the specification of requirements for water permeability tests performed directly within a borehole that has been drilled into the ground, whether above or below the water table, using what is known as an "open system."
: Drill the hole to the desired depth. Clean the bottom of the borehole thoroughly to remove any smeared clay or loose drill cuttings that could seal off water paths.
BS EN ISO 22282-2 details two primary types of tests:
: Record time, water levels, and flow rates at tight intervals initially, expanding the intervals as the system stabilizes. bs en iso 22282-2 pdf
An open system is one where the test section of the borehole is directly open to the atmosphere. Typically, this involves creating a "test zone" within the borehole, often isolated by inflatable packers (seals), to which water is added, and the rate at which this water flows out into the surrounding soil or rock is measured. As the name implies, the test zone remains open and accessible above ground.
) in soils and rocks above or below the groundwater table using open borehole systems. As a core document within the European and International geotechnical framework, this standard establishes uniform test principles, apparatus configurations, fieldwork procedures, and mathematical interpretations. It serves as a vital component for projects executing site investigations under . 1. Scope and Technical Core of BS EN ISO 22282-2
BS EN ISO 22282-2 is a European Standard for "Geotechnical investigation and testing - Geotechnical design - Part 2: Soil and rock slopes and retaining structures". The primary scope of BS EN ISO 22282-2
During a constant head test, the water level in the borehole is maintained at a fixed elevation while the rate of water inflow (or outflow) required to hold that level is measured. A series of test steps is typically performed at different water level elevations, and the flow rates are recorded. A field case study on the Lower Thames Crossing project illustrates how constant head testing is performed: the test comprised three 90‑minute steps, with the pumping flow rate increased for each step to maintain successively higher water levels.
For variable head : Rapidly add or extract water to achieve the starting head difference.
Official, compliant digital copies of this standard are available directly through authorized portals like the BSI Knowledge Platform or DIN Media . This comprehensive technical guide outlines the core principles, testing methodologies, equipment precision rules, and reporting frameworks enforced by the standard. 1. Scope and Technical Framework An open system is one where the test
: Provides the final interpretation of results, including calculated permeability values, graphs of head vs. time, and details on any unsaturated soil conditions encountered. Where to Access BS EN ISO 22282-2
Water is removed (bailed) from the borehole, lowering the water level. Engineers measure the rate at which the groundwater flows back into the hole. This is preferred in situations where adding water might disturb the natural soil structure. 2. Constant Head Tests
-factors) required based on whether the test zone is an open-ended pipe, an elongated cylinder, or a screened interval. Why the PDF Version is Vital for Engineers
Unfortunately, I'm a text-based AI and do not have direct access to copyrighted materials like PDFs. However, I can try to provide you with some useful information and alternatives:
: Guidance on isolating test sections in both stable (rock) and non-stable (soil) ground, using perforated tubes, filter packs, or packers. Measurement Accuracy : Water Level : Accuracy must be within 0.01 meters.