Vijeo Designer 62 Tutorial |top|
Use the Navigator to manage project elements and the Toolchest to drag and drop pre-made graphical objects and scripts. 3. Core Development Tasks Variable Management
Now for the visual part: creating the screens (called "panels") for your application. For our tank example, we will need three different screens:
High-resolution scaling without pixelation.
Double-click the lamp. In the field, select a feedback tag from your PLC (e.g., a Motor_Running Boolean tag). vijeo designer 62 tutorial
Now that our variables are configured, we can map them to graphical elements on . Adding a Control Button Open Base Screen 1 by double-clicking it in the Navigator.
is the classic configuration software used to create human-machine interface (HMI) applications for Schneider Electric’s Magelis (now Harmony) terminals. Whether you are a student or a controls engineer, mastering this software is essential for industrial automation. 1. Creating Your First Project Launch Vijeo Designer and select "Create New Project." Project Name: Give your project a clear, descriptive name. Target Selection:
: Use the Toolchest to drag and drop buttons, numeric displays, and textual objects. Advanced Functions : Configure Trend Graphs Simulation : Right-click your Target and select Start Simulation (Build) to test without physical hardware. Working with Text & Messages Use the Navigator to manage project elements and
Switch to the tab to type "START" on the button face. Customize colors in the Color tab. Creating a Status Indicator (Lamp)
Avoid drawing everything from scratch. Open the panel, browse categories like Pumps or Valves , and drag them onto your canvas. Double-click the graphic to bind its color animation to an external PLC Boolean variable (e.g., Green = Running, Red = Stopped). 5. Alarms, Trends, and Data Logging
In the Navigator, right-click your node and select Properties . For our tank example, we will need three
One of the most powerful features of Vijeo Designer is object animation. For example, you can make a tank graphic fill and empty according to a level variable, or make a pump icon rotate when the pump is running.
If linking to a PLC, configure the IP address or serial driver. Vijeo Designer 6.2 supports multi-PLC connectivity, allowing one HMI to communicate with devices from Schneider, Siemens, Omron, and Mitsubishi simultaneously.
You cannot ship a machine without security.
