Pwd Dsr 2015-16 Maharashtra [upd] Jun 2026
(e.g., Jails, Mental Hospitals): 15% increase Classification of Work Items
| Item | Unit | Rate (₹) | |------|------|-----------| | Earthwork excavation in ordinary soil | cum | 145 | | PPC 1:4:8 | cum | 3,850 | | RCC M20 (1:2:4) | cum | 6,200 | | 1st class brick masonry (CM 1:6) | cum | 4,500 | | 12 mm cement plaster (1:6) | sqm | 115 | | Steel reinforcement (Fe500) | kg | 55 | | Whitewashing (2 coats) | sqm | 18 |
Included for natural minerals like sand, rubble, and metal. Pwd Dsr 2015-16 Maharashtra
Higher rates were applied in municipal corporations due to higher labor and material costs.
The 2015-16 edition of the Maharashtra DSR is a highly structured document divided into several chapters, each covering distinct aspects of civil engineering and building construction. 1. General Notes and Detailed Specifications Where to Find PWD DSR 2015-16 Documents The
Auditing agencies refer to these rates to check if projects were executed within sanctioned cost estimations. 5. Where to Find PWD DSR 2015-16 Documents
The for Maharashtra serves as the foundational financial and technical blueprint for all public infrastructure projects undertaken in the state during that fiscal year. These documents provide standardized item-wise rates for civil construction, ensuring transparency and uniformity across different regions. Purpose and Structure local municipal bodies
The represents a specific historical fiscal period used by engineers, contractors, and government officials for project budgeting and auditing. Key Components of the 2015-16 DSR
Excavation in different soil types, hard rock blasting, and embankment filling.
Geared toward complex structural engineering, providing standard pricing for foundations, substructures, and superstructures: Maharashtra PWD DSR Rates 2015-16 | PDF - Scribd
The serves as the definitive administrative and financial framework for estimating civil engineering project costs across Maharashtra. Published annually by the Government of Maharashtra PWD , the 2015-16 edition established a standardized pricing matrix for raw materials, machinery usage, specialized labor, and regional transport variables. This schedule acts as a legal and technical benchmark used by state government engineers, local municipal bodies, private contractors, and project estimators to compile accurate Bills of Quantities (BOQ), formulate budget estimates, and evaluate public infrastructure tenders neutrally. Core Architecture of the 2015-16 DSR