Hager Controls Bp 10140 - Manual

Installation should be performed by qualified electricians or trained technicians familiar with low-voltage lighting control systems [1].

Many non-KNX detectors offer direct hardware configuration:

Verify that the "Power" LED on the device is lit, indicating bus connectivity. C. Mounting Snap the device onto the DIN rail.

The device will automatically prompt you to create the corresponding OFF time. Repeat the process to select the time and days for the system to shut down. Press Menu to exit and save the program. Advanced Functions Manual Override (Temporary or Permanent) hager controls bp 10140 manual

Features a three-position switch for permanent on, automatic, or permanent off.

By following the guidelines in this article and consulting the official manual for your specific product, you can ensure a safe, reliable, and optimally configured Hager electrical installation.

: All electrical work must be performed by a qualified electrician. Ensure the circuit is protected by a 10A breaker. 2. Setting the Timer Mounting Snap the device onto the DIN rail

If you need help tailoring this guide to your specific setup, please tell me:

: Forces the internal relay into a permanently energized state, ignoring schedules.

Press and hold the Menu and OK keys simultaneously for 3 seconds to unlock the interface. Factory Reset Press Menu to exit and save the program

To set a specific window where connected hardware (like lighting, pumps, or HVAC) switches on and off: Press , navigate to Prog , and press OK . Select New to create a fresh operational command.

Enters programming mode or steps back out of a menu.