+--------------------------------------------------------+ | MAIN POWER CONNECTION | | (230V AC Input / Fuse) | +----------------------------+---------------------------+ | v +--------------------------------------------------------+ | CENTRAL POWER TRANSFORMER | | (Low-Voltage DC Outputs) | +----------------------------+---------------------------+ | +--------------------------+--------------------------+ | | | v v v +-----------------+ +-----------------+ +-----------------+ | CHAIR MOTOR | |MAIN PCB CONTROL | | DELIVERY MODULE | | DRIVE BOARD | | MOTHERBOARD | | SUB-CIRCUIT | +--------+--------+ +--------+--------+ +--------+--------+ | | | v v v +-----------------+ +-----------------+ +-----------------+ | Lift/Tilt Servos| |7" Touch Display | | Micro-Motors / | | & Limit Switches| |& User Interface | | Piezo Scalers | +-----------------+ +-----------------+ +-----------------+ Fluid Control Architecture
Execute a intensive disinfection cycle using the onboard hygiene system (W.H.E. or BIOSTER system). Annual Kit Replacement (12-Month Service)
Perhaps the most valuable section for 2021 models:
The is more than a binder of diagrams and tables. It is the definitive guide to ensuring that every dialysis session conducted on an A7 machine is safe, accurate, and compliant with international standards (ISO 23500-5:2021). anthos a7 service manual 2021
Water pressure between 3.0 and 5.0 bar. Hardness should not exceed 15°F (French degrees) to prevent premature scale buildup.
Clean the solids collector trap in the cuspidor and the suction unit filters. Bi-Annual Service
Anthos A7 Service Manual 2021: Complete Technical Maintenance and Repair Guide It is the definitive guide to ensuring that
Understanding the technical parameters of the Anthos A7 is fundamental for its safe and effective operation. The key specifications from the official manuals are:
: Procedures for replacing spare parts, accessing internal boards, and managing the CAN LITE system. Hygiene Systems
Position the chair frame using specialized Cefla handling lift rods. Secure the structural base plate directly to the concrete floor using heavy-duty masonry anchors. Avoid placing any external weight or altering the factory-set shipping posture until the base anchors are torque-tested. Step 2: Dual-Axis Leveling Clean the solids collector trap in the cuspidor
220–240V AC, 50/60 Hz. Dedicated grounding line required.
If you want, I can:
Test the electrical grounding resistance and current leakage levels to verify compliance with medical standards. Official Technical Resources